The scope of work will consist of prefabricating hundreds of metal stud wall panels here at our fabrication facility. The panels will be pre-finished with Dens Glass Sheathing, sprayed polyurethane foam, E.I.F.S. exterior cladding and pre-installed windows for a true – 100% pre-finished ready for installation type construction, the first of it’s kind in the State of Maine. The work will take place at our office complex in Sabattus, ME and will be shipped via trailer truck and erected onsite with a 100 Ton crane.
Author Archives: T.H. Services
RDI lands 43 Baxter Boulevard Re-Facade’ and Renovations
Roland’s Drywall landed the renovation work and facelift of the 43 Baxter Boulevard project in Portland, ME.
Work will consist of Framing, Insulation, Drywall and a New Exterior E.I.F.S. cladding on the building. The General Contractor is Wright-Ryan of Portland, ME.
RDI awarded contract for TD Bank Call Center
Roland’s Drywall, Inc. was awarded the contract for the TD Bank Call Center at the Auburn Mall in Auburn, ME. Our scope of work will consist of exterior and interior metal stud framing, exterior sheathing, E.I.F.S., shaft-wall systems, acoustical insulation, thermal insulation, all drywall installation and taping finishes, USG Tuff-Hide primer surfacer coatings, Hilti fire stop systems, hollow metal door frame installation and installation of interior doors and hardware. Work is expected to start in February of 2010 with an August 2010 completion. The General Contractor is Pizzagalli Construction of Portland, ME and the Architectural Firm is Harriman Associates of Auburn, ME.
Roland’s Drywall lands contract for Hutchins Funeral Home in Westbrook, ME.
Roland’s Drywall, Inc. was awarded the contract for the Hutchins Funeral Home in Westbrook, Maine. Our scope of work will consist of metal stud interior framing, soffit and ceiling framing systems, shaft-wall systems, acoustical insulation, all drywall installation and taping finishes. Work is expected to start in December of 2009 with an May 2010 completion. The General Contractor is HOMEworks Builders of Portland, ME.
RDI Awarded Contract for Acadia Hospital Psychiatric Observation Unit and Connector in Bangor, Maine
Roland’s Drywall, Inc. was awarded the contract for the Acadia Hospital Psychiatric Observation Unit and Connector Addition in Bangor, ME. Our scope of work will consist of bearing wall and roof exterior and interior metal stud framing, shaft-wall systems, acoustical insulation, thermal insulation, all drywall installation and taping finishes. Work is expected to start in September of 2009 with a December 2009 completion. The General Contractor is Nickerson and O’Day Construction of Brewer, ME.
RDI Secures Contract for The York High School Music Wing Addition and School Renovations.
Roland’s Drywall, Inc. was awarded the contract for the York High School Music Wing Addition in York, ME. Our scope of work will consist of exterior and interior metal stud framing, shaft-wall systems, acoustical insulation, thermal insulation, Henry Blueskin air and vapor barrier exterior envelope systems, all drywall installation and taping finishes. Work is expected to start in September of 2009 with a May of 2010 completion. The General Contractor is Ledgewood Construction of Portland, ME and the Architectural Firm is PDT Architects of Portland, ME.
RDI lands Hud project for Birch Hill Apartments – Lewiston, Maine
Roland’s Drywall, Inc. was awarded the contract for the new HUD Project – Birch Hill Apartment Complex in Lewiston, ME. Our scope of work will consist of interior metal stud framing and resilient channels, acoustical insulation, thermal insulation, all drywall installation and taping finishes. Work is expected to start in June of 2009 with a September 2009 completion. The General Contractor is Benchmark Construction of Westbrook, ME and the Architectural Firm is Winton Scott Architects of Portland, ME.
RDI awarded the Kennebec Valley Community College
Roland’s Drywall, Inc. was awarded the contract for the King Hall Renovation work at Kennebec Valley Community College in Fairfield, ME. Our scope of work will consist of light gauge exterior metal stud framing, exterior paperless dens glass sheathing and joint sealants, light gauge metal stud engineering and shop drawings, interior metal stud framing, acoustical insulation, thermal insulation, Carlisle Air and Vapor Barrier weather wraps and trims, rigid insulation, plywood, wood blocking, all drywall installation and taping finishes. Work is expected to start in May of 2009 with a September 2009 completion. The General Contractor is The Sheridan Corporation of Fairfield, ME and the Architectural Firm is Harriman Associates of Auburn, ME.